Zeeb Road Phase V
Phase V will bring the Zeeb Road Pathway north over the Huron River and connect to the B2B Trail at Huron River Drive. The alignment will require easements on private property and across the railroad tracks, a dedicated pedestrian bridge, environmental permits, and significant engineering to address slope issues at key locations. Due to the complexity of this section, the Township may break the project into two subsections, with a goal of completion by 2025 or 2026.
Both Phase V and VI have received substantial financial contributions from the state to fund design and construction of these segments. The contributions are a direct result of assistance from Representative Donna Lasinkski’s office.